BuySellBlogBrowse Listings

2037 Aster LaneLafayette, CO 80026

For Sale

$799,000

Smart Buyer Rebate $7,990

**Backyard Oasis with Views** Welcome to charming Aster Lane, where designer style meets everyday comfort in this large, comfortable 4-Bedroom home located on over 1/4 acre! Tucked away at the end of a cul-de-sac/lane, this 2018 McStain home offers exceptional value, privacy and a strong connection to nature. Interested in a horse view from your front stoop? Like the idea of a short stroll to Waneka Lake Trail? Then you are home! Step inside a light-filled layout with soaring ceilings and thoughtful details throughout, including stunning light fixtures and luxury vinyl flooring. Your gourmet kitchen is a showstopper, featuring soft-close drawers, roll-out shelving, a generous pantry, and elegant Quartzite countertops, gas stove, accented by a custom tile backsplash. A main-level study can serve as your private Office or a conforming Guest Bedroom - conveniently located next to a sleek 3/4 Bath with an oversized shower. Upstairs, the Primary Suite feels like a retreat with walk-in closet and abundant natural light. Plus a versatile loft offers bonus space for another Home Office, Media or Game Zone. Two hall bedrooms complete the upper level, including a 3/4 Hall Bathroom. Enjoy sunny, charmed Colorado living at its best on both the inviting front patio-overlooking HOA open space. Huge lot to enjoy! Enjoy sunny days and summer evenings on the brand-new flagstone patio! The drip irrigation system keeps the landscaping, flowers, and veggie garden lush and thriving - so you can relax, entertain, and enjoy the outdoors without the extra work. And don't miss the Koi fish renderings by renown artist, Jeremy Novy. The covered back porch that opens to scenic open space, parks, and walking paths. Newer roof (2021). HVAC maintained recently. Preferred Lender will contribute 1% of loan amount to Buyers closing costs or interest rate buy down. Call for details.

Listed by Cory Nickerson

·

License #IRP15983

·

8z Real Estate

·

303-961-6031

Last updated November 18, 2025

·

Source: REcolorado #IR1046885

Listing Facts

  • TypeSingle-family
  • NeighborhoodLafayette
  • Bedrooms4
  • Bathrooms3
  • Days on Prevu17
  • HOA/Maint. Fees$285/month
  • Taxes$4,748/year
  • Size2,509 sqft
  • Price per sqft$318

Amenities

  • Dishwasher
  • Private Outdoor Space
  • Washer/Dryer
  • Air Conditioning
  • Parking

Location

Mortgage Calculator

Listing History

11/06/2025
Status changed to Active
$799,000
11/02/2025
Listed by 8z Real Estate
$799,000

Property Details for 2037 Aster Lane

Association

Fees

  • Association Fee: $285.00 Monthly
  • Association Fee Includes: Reserves, Snow Removal, Trash

General

  • Association Name: Advance HOA

Exterior

Construction

  • Roof: Composition
  • Structure Type: House
  • Window Features: Double Pane Windows, Window Coverings
  • Year Built: 2018
  • Architectural Style: Contemporary
  • Construction Materials: Brick, Frame

Features

  • Direction Faces: South
  • Patio And Porch Features: Deck, Patio
  • Road Frontage Type: Private Road
  • View: Mountain(s)

Measurements

  • Building Area Total: 3,773
  • Lot Features: Cul-De-Sac, Open Space, Sprinklers In Front
  • Lot Size Acres: 0.27
  • Lot Size Square Feet: 11,599

Financial

Taxes

  • Parcel Number: R0608135
  • Tax Annual Amount: $4,748.00
  • Tax Year: 2024

Interior

Features

  • Appliances: Dishwasher, Dryer, Microwave, Oven, Refrigerator, Washer
  • Fireplace Features: Living Room
  • Flooring: Tile
  • Interior Features: Eat-in Kitchen, Kitchen Island, Open Floorplan, Pantry, Vaulted Ceiling(s), Walk-In Closet(s)

Measurements

  • Living Area: 2,509

Rooms

  • Basement: Full, Unfinished
  • Has Basement: Yes
  • Bathrooms Three Quarter: 3
  • Bathrooms Total Integer: 3
  • Bedrooms Total: 4
  • Main Level Bathrooms: 1
  • Main Level Bedrooms: 1

Other

General

  • Exclusions: Seller's personal property

Location

  • Subdivision Name: Indian Peaks Flg 2

Parking

Parking

  • Attached Garage: Yes
  • Garage Spaces: 2
  • Parking Total: 2

Schools

Elementary School

  • Elementary School: Lafayette
  • Elementary School District: Boulder Valley RE 2

High School

  • High School: Centaurus
  • High School District: Boulder Valley RE 2

Middle or Junior School

  • Middle Or Junior School: Angevine

Utilities

Equipment

  • Cooling: Ceiling Fan(s), Central Air
  • Heating: Forced Air, Hot Water
  • Laundry Features: In Unit
  • Utilities: Cable Available, Electricity Available, Internet Access (Wired), Natural Gas Available
  • Water Source: Public

The content relating to real estate for sale in this Web site comes in part from the Internet Data eXchange ("IDX") program of METROLIST, INC., DBA RECOLORADO® Real estate listings held by brokers other than Prevu are marked with the IDX Logo. This information is being provided for the consumers' personal, non-commercial use and may not be used for any other purpose. All information subject to change and should be independently verified.

Full MLS Disclaimers

Rebate estimate is indicative only and based on listing price and estimated buyer's agent commission paid by owner, if applicable. Final rebates are subject to Terms of Use and may vary due to final negotiated transaction terms.